30 November 2018 | 30th QualTech Prize
There was a strategic decision to setup CFS plant in Megasite, Phaltan location and existing PMUC infrastructure was finalised for CFS operations.
30 November 2018 | 30th QualTech Prize
Marico Ltd, Baddi is engaged in Refining and Blending of edible vegetable oil. Raw RBO quality varies significantly basis source & seasonality and hence quality output at lowest conversion cost remains key management priority.
30 November 2018 | 30th QualTech Prize
The project was identified from the list of critical chronic hazards list combined with the Top contributor of Cost Of Poor Quality.
30 November 2018 | 30th QualTech Prize
Business Unit – Heavy Civil of Strategic Business Unit – Urban Infrastructure of Tata Projects is executing the Dilshad Garden – New Bus Adda (Ghaziabad) Line-1 extension project of Delhi Metro Rail Corporation.
30 November 2018 | 30th QualTech Prize
Quality improvement in HPMC capsules was taken up due to recurring customer complaint of “wrinkle” defect leading to loss of market segment in Asia Pacific.
30 November 2018 | 30th QualTech Prize
During APC cycle all the chronic issues are collected by departments and under Top management guidance they were deployed down to each APS trained executives.
30 November 2018 | 30th QualTech Prize
Conventionally Diesel Hydrotreatment (DHT) projects in other Indian refineries have taken around 36-44 months but BPCL Mumbai Refinery (MR) took the challenge to mechanically complete the project in 17 months.
30 November 2018 | 30th QualTech Prize
Tata Power has robust mechanism to review performance in every function of the organization. Operating business at benchmark level, is an integral parameter of MD’s Balance Scorecard (BSC).
30 November 2018 | 30th QualTech Prize
We are in the manufacturing of Safety glasses and our major part is associated with Architectural glass. Our critical process is Toughening.
30 November 2018 | 30th QualTech Prize
Business Improvement initiatives were identified and prioritized using project hopper basis its potential savings.
29 November 2018 | 30th QualTech Prize
Surface finish is most critical parameter of the Cylinder Block and consequently for Engine performance.
29 November 2018 | 30th QualTech Prize
L&T is among the leading suppliers of Surface Condensers in domestic market. Surface Condenser is an important thermal power plant equipment and its performance affects plant efficiency.
29 November 2018 | 30th QualTech Prize
Tata Power strives for producing power at minimum cost by continuously improving its system efficiency and optimizing operating cost.
29 November 2018 | 30th QualTech Prize
We are a captive Shared services for JSW group covering Financial, Purchasing and HR Operations.
29 November 2018 | 30th QualTech Prize
Our Top Management attendant a vendor conference of elite professional OEM in which marketing representative was reveling the quality strategy for global business of projected newly launch CAR.
29 November 2018 | 30th QualTech Prize
In Electrical network of G&B Vikhroli, we have 22KV HT substation having contract demand of 14MVA and connected load of 25MVA.
29 November 2018 | 30th QualTech Prize
Marathon Nexworld is a revolution in ‘Design Thinking’. Spread across 200 acres in Dombivli, it provides an opportunity to create iconic homes for the affordable segment.
29 November 2019 | 30th QualTech Prize
Marico Ltd., Perundurai is engaged in manufacturing and packing of Parachute coconut Oil. We have State of Art oil expelling unit with dedicated packing facilities.
29 November 2018 | 30th QualTech Prize
ABI-Halol manufactures Insulators. One of the key process of Insulator manufacturing is firing of the green wares. For firing, we use Natural Gas as the primary fuel and it costs around 16-17% of the total operating cost.
29 November 2018 | 30th QualTech Prize
The basis of the project arrived from the aim to bring the quality defects to zero. The project started with modifying the filling cartridge to reduce the residue complaints in OEM paints.