Design Upfit Process to Cater 1000 Engines/ Month from 835 Engines for High Volume SO’s at IMEP

0 5 /5
There was a strategic decision to setup CFS plant in Megasite, Phaltan location and existing PMUC infrastructure was finalised for CFS operations.