Increase in Run Length between Two Grid Cleaning in TR-1 in LLDPE Plant

0 0 /5
In LLDPE plant, there is a grid (5mm diameter holes) inside the main polymerization reactor of Train-1. This grid, over a period of operation, gets choked with powder which requires a shutdown for cleaning. Presently the grid is cleaned twice a year, with downtime of 145hrs&slowdown of 96hrs each time.