Improvement Projects
|
Bharat Aluminium Company Ltd., Korba Project: Reduction in Specific HFO Consumption from 52L/MT to 46L/MT |
Electrosteel Steels Ltd., Bokaro Project: In Blast Furnace, the Pulverized Coal Injection Rate to be Increased from 126kg/THM to 175kg/THM & Sustain |
Electrosteel Steels Ltd., Bokaro Project: Reduction in Auxiliary Power Consumption of Captive Power Plant from 10.41% to 8.91% and Sustain |
Electrosteel Steels Ltd., Bokaro Project: Utilization of Waste Annealing Furnace Gas for Core Drying Process in Ductile Iron Pipe Plant |
Global Indian International School, Abu Dhabi Project: Heartfulness Intervention |
Global Indian International School, Whitefield, Bengaluru Project: Improving Students Behavior by Conditioning of Habits |
JSW Global Business Solutions Ltd., Belapur, Navi Mumbai Project: Improve Process Efficiency of Commercial by 40% within 8 Months (Project: ‘SIDDHI’) |
Kansai Nerolac Paints Ltd., Bawal Project: Throughput Improved By 25% |
Kansai Nerolac Paints Ltd., Sayakha Project: Service Time Reduction of Coil Coating Products by 30% |
Larsen & Toubro Ltd., Heavy Engineering Project: Improvement in Throughput of Overlay Shop |
Max Speciality Films Ltd. Project: Improvement in In-House Scrap recycling & reuse by 35% |
SBI Life Insurance Co. Ltd. Project: Smart Connect - For connecting with Renewal Customers |